Membrane capping of follow-up sewage pool in Zhanji

The follow-up anti hanging membrane structure can place the sewage treatment equipment outside the cover body to avoid corrosion and reduce maintenance costs.

Get Started >

The volume of the follow-up anti hanging membrane is only 1 / 2 of that of the fixed type, and the follow-up anti hanging membrane rotates with the pool body, so it can be considered not to enter into the design, while the fixed type needs to enter into the design, so the air exchange frequency is naturally different. According to the data, it is found that the air volume of the fixed anti lifting film is 4-5.5 times of that of the follow-up anti lifting film. Next, we will introduce the follow-up anti lifting membrane to you.



1. The follow-up anti hanging membrane structure can place the sewage treatment equipment outside the cover body to avoid corrosion and reduce maintenance costs. At the same time, the cost of deodorization equipment can be directly reduced by less air volume of follow-up anti hanging membrane.

2. There is no need to carry out explosion-proof transformation for the follow-up anti lifting film scraper, which saves the cost of transformation. At the same time, the gas volume of the follow-up anti hanging membrane is only 20% - 25% of that of the same size sump hood, which can reduce the input of waste gas treatment equipment.



3. Since all the equipment of the follow-up sewage pool anti lifting membrane are outside the sealing cover, the operators and maintenance personnel do not need to enter the sealing body to operate, which greatly improves the safety degree; if the fixed cover is adopted, the internal long-term treatment and sealing state, the toxic gas concentration is very high, and the operator enters the internal operation or maintenance risk coefficient is very high.

As a leading enterprise in China's membrane structure industry, Zhanji not only integrates foreign advanced new technologies, materials and processes, but also has an independent production and R & D base covering an area of more than 10000 square meters. Welcome to visit Shanghai Zhanji company to learn more.

  • ENVIRONMENTAL FACILITIES

  • COMMERCIAL FACILITIES

  • AIR DOME STRUCTURES

  • TRANSPORTATION AND TRAFFIC FAC

  • ATHLETIC AND SPORTS FACILITIES

  • LANDSCAPE AND SHADE STRUCTURES

Membrane capping of follow-up sewage pool in Zhanji

What risks can be avoided by covering the sewage tank with anti hanging membrane?

The usage rate of reverse hanging membrane covering in sewage tanks is increasing now. So, what risks can reverse hanging membrane covering in sewage tanks avoid? Let's take a closer look together.

Choose air film building to see which advantages?

With the progress of science and technology and the popularity of the concept of environmental protection, gas film building, as an innovative form of building, is gradually favored by people.So, when choosing a gas film building, what advantages should we pay attention to?

Where is the difficulty of VOCs pollution control?

In recent years, ozone pollution has become a difficult problem affecting the improvement of atmospheric environment quality. As one of the main precursors of ozone formation, VOCs pollution control is an important topic for the "14th Five-Year Plan" PM2.5 and ozone collaborative control. Where is the difficulty of VOCs pollution control?

Transform the football field, the characteristics of the gas membrane indoor football field

Inflatable membrane football stadium belongs to the indoor football field, the main structure adopts membrane structure design, the principle is the same as that of large balloons, due to the difference in internal and external pressure of the membrane structure, the tens of tons of membrane structure expands, and the surrounding is connected with the ground and anchored by steel cables and concrete ground, forming a tight air support structure, which can be built in the shortest time.

From the Learning Center