What should be paid attention to when the sewage pool is covered?

It seems very simple to cover the surface of anti hanging membrane of sewage tank, but in fact, the construction of membrane cover is a very complex process with high technical content. In the construction process, some small details should be paid special attention to, so as to avoid causing large losses.

Get Started >

It seems very simple to cover the surface of anti hanging membrane of sewage tank, but in fact, the construction of membrane cover is a very complex process with high technical content. In the construction process, some small details should be paid special attention to, so as to avoid causing large losses. Next, I'd like to introduce the details that should be paid attention to in the construction of sewage pool membrane capping.

1. The working point of the same straight line boundary must be ensured. For other rigid boundary, because the component itself has certain scale space, the working point shall be changed or the working point of the membrane shall be kept unchanged according to the actual situation;

2. The utilization rate of membrane materials and production work must conform to the calculation model. The treatment of field joint is to avoid leakage, so it is generally found more appropriate on site;

3. When installing the membrane structure, a crawling net shall be installed on the membrane surface, and the operator shall wear a belt. During installation, the operator shall wear soft sole when walking on the membrane surface, and shall not wear hard objects such as keys;

4. When the wind force is no more than level 4, the installation of anti lifting membrane shall be carried out. During the installation process, the wind speed and direction shall be paid full attention to to avoid vibration. Meanwhile, the suspension and continuation of the project shall be determined according to the rainfall degree。

Shanghai Zhanji Membrane Structure Co., Ltd. is a world-renowned leading comprehensive solution provider of membrane structure technology, providing customers with professional overall solution of membrane structure. At the same time, it is also an earlier group of membrane structure benchmarking enterprises specialized in R & D, design, production, processing, construction and installation.

  • ENVIRONMENTAL FACILITIES

  • COMMERCIAL FACILITIES

  • AIR DOME STRUCTURES

  • TRANSPORTATION AND TRAFFIC FAC

  • ATHLETIC AND SPORTS FACILITIES

  • LANDSCAPE AND SHADE STRUCTURES

What should be paid attention to when the sewage pool is covered?

What risks can be avoided by covering the sewage tank with anti hanging membrane?

The usage rate of reverse hanging membrane covering in sewage tanks is increasing now. So, what risks can reverse hanging membrane covering in sewage tanks avoid? Let's take a closer look together.

Choose air film building to see which advantages?

With the progress of science and technology and the popularity of the concept of environmental protection, gas film building, as an innovative form of building, is gradually favored by people.So, when choosing a gas film building, what advantages should we pay attention to?

Where is the difficulty of VOCs pollution control?

In recent years, ozone pollution has become a difficult problem affecting the improvement of atmospheric environment quality. As one of the main precursors of ozone formation, VOCs pollution control is an important topic for the "14th Five-Year Plan" PM2.5 and ozone collaborative control. Where is the difficulty of VOCs pollution control?

Transform the football field, the characteristics of the gas membrane indoor football field

Inflatable membrane football stadium belongs to the indoor football field, the main structure adopts membrane structure design, the principle is the same as that of large balloons, due to the difference in internal and external pressure of the membrane structure, the tens of tons of membrane structure expands, and the surrounding is connected with the ground and anchored by steel cables and concrete ground, forming a tight air support structure, which can be built in the shortest time.

From the Learning Center