Sewage tank capping project is a good choice for modern management. For this project design and construction, there are many preparations required, which need to be jointly completed by the owner, design, supervision, quality inspection and other departments.

Get Started >

Sewage pond capping project is a good choice for modern treatment. For this project design and construction, there are a lot of work to be prepared, which need to be completed jointly by the owner, design, supervision, quality inspection and other departments. So what are the design elements of the sewage pool capping project?

1. Develop the joint review system of design drawing disclosure, installation and design cooperation; The project department of the construction unit shall organize relevant technicians to cooperate with the design, fully consider the matching of the overall installation scheme of the design and construction, and participate in the coordination work such as the drawing presentation and joint review organized by the owner.

2. Establishment of regular meeting system: regular meetings shall be held regularly to discuss the construction and cooperation of the project with the participation of the owner, design, construction and supervision.

3. Discuss construction problems regularly: For major new technical problems in construction, relevant personnel of all parties shall gather together to discuss and solve them together.

4. Technical requirements of construction unit: Due to the high technical requirements of the anti-hanging membrane structure, professional construction units should be selected to make reasonable production and allocation according to the project needs.

  • ENVIRONMENTAL FACILITIES

  • COMMERCIAL FACILITIES

  • AIR DOME STRUCTURES

  • TRANSPORTATION AND TRAFFIC FAC

  • ATHLETIC AND SPORTS FACILITIES

  • LANDSCAPE AND SHADE STRUCTURES

From the Learning Center