Maintenance Knowledge of Reverse Hanging Membrane Deodorizing and Capping of Sewage Tank

1. After the construction of the anti-hanging membrane structure is completed, it is necessary to pay great attention to maintenance and maintenance to ensure normal use, which is different from general buildings. The long-term maintenance and maintenance of the anti-hanging membrane structure building should be taken care of by a dedicated person, and problems are found and solved in time.

Get Started >

Maintenance knowledge of reverse hanging membrane deodorizing and capping of sewage tank:

1. After the construction of the anti-hanging membrane structure is completed, it is necessary to pay great attention to maintenance and maintenance to ensure normal use, which is different from general buildings. The long-term maintenance and maintenance of the anti-hanging membrane structure building should be taken care of by a dedicated person, and problems are found and solved in time.

2. The tightness of sealing should ensure the safe connection between each edge member and the film surface, and the sealing performance is good.

3. Maintenance and inspection Within a period of time after the anti-hanging film project is completed, the production and installation unit shall be responsible for inspection and maintenance, and provide maintenance manuals to the user. Within one year after the construction of the anti-hanging membrane structure is completed, the anti-hanging membrane structure should be regularly inspected and maintained at least once. When the membrane surface is found to be abnormal, pre-tension reinforcement or other measures should be taken. If the connection is loose, it should be fully tightened Or be reinforced.

4. Drainage system maintenance Check and clean the membrane surface before the rainy season and winter to keep the membrane surface drainage system unobstructed. In areas with heavy snow loads, necessary emergency measures such as snow melting and snow removal should be provided.

5. Membrane structure projects can conduct roof inspection and liquidation of membrane structure projects before the rain season and winter fall each year to prevent loosening of waterproof nodes and blockage of water fall, gutters and cornices, and keep the roof drainage system unblocked.

  • ENVIRONMENTAL FACILITIES

  • COMMERCIAL FACILITIES

  • AIR DOME STRUCTURES

  • TRANSPORTATION AND TRAFFIC FAC

  • ATHLETIC AND SPORTS FACILITIES

  • LANDSCAPE AND SHADE STRUCTURES

From the Learning Center